Staking out the land
Project: Baan Sanploen
Posted By Alec on February 11, 2010
Today, with the land cleared and the plans finalised, the area was staked out and a datum level established from which to ensure the correct level of all components of the structure. The position of the structural supporting columns was marked out, then following this the placement of the holes to be dug for the footings of the building.




