Tying the ground floor steel re-enforcement

Project: Baan Sanploen

Posted By on March 2, 2010

The concrete is due to be poured for the ground floor tomorrow, so the steel re-enforcing structure that is to be embedded within it had to be laid out and tied together. Also, initial plumbing for the kitchen and ground floor bathroom had to be fitted. Conduit for the mains power supply was also fitted.