Roof framework complete

Project: Thip Thani - 4 Bedroom Home

Posted By on May 29, 2011

It’s been a while since my last post about this project, but all of the floor slabs are now in.  The steel roof framework has been constructed and the block work is well nearing completion.  We will now begin tiling of the roof and continuing with the block work.

A new hotel for Nong Khai

Project: LiveInn Nong Khai

Posted By on May 22, 2011

The “LiveInn Nong Khai” is one of Nong Khai’s newest hotels, however they are already finding themselves full to capacity and needing to expand. We have been commissioned to design a new 6 storey 80 room building to add additional space. The new building will house a new larger reception area to replace the one in the existing building. There will also be a restaurant and conference facility. We are now busy developing our initial concept – I will be posting some 3D renderings of the concept as it develops. Construction is due to begin later this year.

Modern 2 Bedroom 2 Storey Home

Project: Modern 2 Bedroom 2 Storey Home (Thip Thani)

Posted By on May 22, 2011

We have just begun work on the design for a modern style 2 bedroom 2 storey home, with construction set to begin some time in July.  More details to follow as the design develops.

“Amoon on the Mekong” – Luxury guest house design

Project: Amoon on the Mekong

Posted By on May 22, 2011

I have not blogged about this project before, however it is one that we have been working on for over a year, now.  I enjoy all of our design and construction projects, but this one has been particularly thrilling to have been a part of so far.  ”Amoon on the Mekong” will be a luxury guest house in an idyllic setting amongst 13 Rai (5 Acres) of mature trees on the banks of the Mekong River, backed by the rolling hills of Sangkhom and enjoying wonderful views across the river to Laos.

When we were first approached, the design project was well underway.  Our client had already been working with an architect in Australia for a number of years developing an architectural concept.  This concept has remained largely unchanged, so I can not take credit for all of the architectural design, however we have worked with the client to make tweaks and alterations to achieve a final design.  We also carried out all of the necessary structural analysis, electrical and plumbing engineering work to produce all of the necessary construction drawings and documentation.

We are still working with the client to look at additional potential refinements to the final design.  The construction phase of the project is due for completion before December 2012.

Main structural framework complete

Project: Modern Style 2 Bedroom 1 Storey Home (Nong Kom Ko)

Posted By on May 17, 2011

We are now up to the roof level with the concrete structure of the modern two bedroom home project.  The next stage is to add in the precast concrete slabs for the floor and the roof structure.

Second time lucky….

Project: Modern Style 2 Bedroom 1 Storey Home (Nong Kom Ko)

Posted By on April 30, 2011

We attempted to excavate the footings for our latest project a couple of days ago…..  unfortunately, we encountered a rocky seam about half a meter down full of huge rocks that proved to be too much of a challenge for the small excavator that we were using.  The reason for initially using a small excavator is that it produces much neater holes that require less manual ‘dressing’ prior to pouring the concrete footings.  Today we are continuing with a larger excavator that is more up to the task of removing the large rocks!

Work begins on a modern two bedroom home

Project: Modern Style 2 Bedroom 1 Storey Home (Nong Kom Ko)

Posted By on April 27, 2011

In January I posted images of a concept for a modern style two bedroom home.  Since then, we have worked with the client to develop this concept into a final design and a full set of engineering drawings.  Planning permission has now been granted and today we began clearing the plot of land and marking it out for construction.  The lucky Buddhist day for the first columns to be erected is 4th May.  Between now and then we shall be digging the footings and preparing all of the column reinforcement structures.

Main Concrete Structural Framework Complete

Project: Thip Thani - 4 Bedroom Home

Posted By on April 26, 2011

Today we completed the initial concrete structural framework of our latest project in Thip Thani, and began work on the steel roof structure.  We are now awaiting delivery of the precast concrete floor slabs,  and will begin the block work.

1.5 storey low cost house design

Project: Other Projects

Posted By on April 25, 2011

We recently completed the design of a low cost 2 bedroom house in a 1.5 storey configuration for a customer who has his own construction team ready to build for him.  He came with a basic idea of the style of home he wanted and we developed this into a floor plan and exterior in keeping with this style.

Footings and first stage columns

Project: Thip Thani - 4 Bedroom Home

Posted By on March 24, 2011

With our latest project in Thip Thani, we have finished pouring all of our footings and the first stage column structures, and are now preparing the ground floor beam reinforcement structures and applying the form work ready for casting.  We are also busy with the heavy metal work and form work in preparation for the basement floor and walls.

Painting, Tiling and Window Fitting

Project: Fao Rai - 2 Bedroom Home

Posted By on March 24, 2011

We have now completely tiled the floor of the house and covered the floor with a layer of cardboard to protect the tiles whilst we complete the rest of the interior work.  We are also in the process of installing all of the windows and fitting out the bathrooms.  The granite for the kitchen counter top is due to de delivered and fitted by Monday, which will then allow us to complete the tiling and fitting of the kitchen cabinets and appliances. We have applied an undercoat and are now awaiting top coats of paint.

Painting, ceiling work, kitchen and bathroom preparation

Project: Fao Rai - 2 Bedroom Home

Posted By on March 15, 2011

We have completed most of the exterior architectural detailing work and have poured the concrete foot path and patio areas around the house.  We have also nearly completed adding in the suspended gypsum board ceiling and have begun to paint the house.  We have also begun constructing the kitchen and bathroom counter units and carrying out the necessary plumbing work.

Yesterday we started bringing floor tiles and bathroom fittings etc… to the site, ready for installation.

We are currently a week ahead of schedule for our initial planned completion date of 24th April for this project.

4 Bedroom Home Concept Design

Project: Other Projects

Posted By on February 3, 2011

I have just completed an initial concept design for a 300 sq.m. two storey four bedroom home.

Floor going in, walls going up

Project: Fao Rai - 2 Bedroom Home

Posted By on February 3, 2011

We have finished casting of all of the columns and beams.  The floor slab has now been poured.  In this case we used pre-cast concrete slabs over which was laid a steel mesh.  A layer of concrete was then poured over the tope of this.  This method is much quicker than adding in supports and shuttering and then pouring one thick concrete slab.  Most of the walls have also now been built.  Due to budget constraints with this project, we are using standard blocks, rather than the thermally insulating blocks that we have used on other projects.

Modern Style, Single Storey 2 Bedroom Home Concept

Project: Modern Style 2 Bedroom 1 Storey Home (Nong Kom Ko)

Posted By on January 30, 2011

I have just completed the initial concept for  a new modern style 128sq.m. single storey 2 bedroom home.


Beam shuttering

Project: Fao Rai - 2 Bedroom Home

Posted By on January 25, 2011

We have been continuing preparations for the casting of the main floor beams in a couple of days by adding all of the shuttering around the steel beam reinforcement structure.

Office frontage alterations / Signage

Project: Other Projects

Posted By on January 24, 2011

The owner of a travel agent in Nong Khai asked us to help them with a problem they were having with their office.  The problem was that the office was becoming unbearably hot as it had a glass curtain wall frontage and also large windows at the side.  Sun streamed in all through the day.  Adding blinds inside had not helped as although it blocked out the glare of the sun, it did not stop the office temperature increasing, cause by the sun heating up the air in the gap between the inside of the window and the blind.  Whilst they had air conditioning fitted that should have been the correct power for the size of the office, it did not account for the excessive heat that can build up in such a glass box!  The problem had become so bad that they had resorted to leaving the security shutters down for most of the time.  The problem with this was that passers by then thought that the office was not open!

My solution was to provide a physical barrier to protect the office from the sun.  First we applied a sheet of adhesive material to the window that allows you to see out of from the inside, but blocks much of the light coming in.  I also designed and printed some sections of this material to promote some of the world destinations that the travel agent offers packages to. I then designed a series of solid facia board constructed from a combination of wood, stainless steel and plastic that incorporated the company logo to be mounted outside the window as another physical barrier to the heat of the sun.  These facia boards are all removable from the frame to which they are mounted to allow for cleaning of the windows behind them.  The large white board actually has a hinged glass front in a stainless steel frame and can be opened up to allow posters to be displayed detailing the latest promotions on offer by the travel agent.  Everything that was installed fits between the window and the existing security shutters so that it is protected when the office is closed at night.

We completed all work with this small project a little over a week ago and are happy to report that it has solved the problem….  the office is now cool and airy, and passers by never miss the office because not only are the security shutters open all day, but the company also has a greatly increased street presence as a result of the new signage.

Here is the office as it was, the CAD concept that was presented, and the final result.

Construction begins…

Project: Fao Rai - 2 Bedroom Home

Posted By on January 24, 2011

We broke ground on our 2 bedroom house project in Fao Rai on 16th January.  On 18th Jan we poured the concrete footings. We then prepared the formwork for the first stage columns, which were poured on 22nd Jan.  Yesterday we began to prepare the wooden structure that will support the main beam formwork.  The beams are due to be poured on 27th January.

Modern office exterior work complete

Project: Modern Office Renovation

Posted By on January 13, 2011

We have now completed all of the exterior construction for the modern office renovation project and have now turned our attention to the interior, starting with installing the suspended gypsum board ceiling.

Two bedroom single storey home

Project: Fao Rai - 2 Bedroom Home

Posted By on January 12, 2011

I have just finished the design of a low cost two bedroom single storey home for a client near Fao Rai, Phon Phisai.

The home is entered via some steps leading up to a covered porch and  features a relatively large open plan living / dining room and kitchen area.  This leads on to a large covered deck at the rear.  There is also another covered area for an outside laundry just off from the kitchen area.

The master bedroom has a very large walk-in closet and an en-suite bathroom.  Unusually, at the clients request, the en-suite bathroom then leads on to a walled open-air shower room. There is then a guest bedroom with built in closet and a second bathroom.

We shall be starting construction of this home within the next week, with a scheduled completion date of around the end of May this year.  Check back here for updates on the progress of this build.